LNC Garden Rooms
The process

Six weeks, one team, no surprises on the invoice

Every LNC room follows the same route from first call to handover. Here is exactly what happens, who does it, and what you sign off at each stage.

01
Day one

The first call

Ten minutes on the phone. What do you want the room to do, roughly how big is the space, and when would you like it finished? If we're not the right fit we'll tell you then.

What you get
An honest steer on budget
A survey date
Nothing to sign
02
Within a week

Site survey

We come to you, measure the space, check levels and access, look at where power can run from and assess ground conditions for the foundations. We also check your site against permitted development.

What you get
Measured site notes
Access and services plan
Planning position in writing
03
7–10 days

Design and fixed price

Drawings of the room in your garden, a layout you can move around, finishes to choose from and a written price broken down by stage. Revisions until it's right.

What you get
Plan and elevation drawings
Finish and glazing options
Fixed written price
04
A few days

Base

Concrete pile foundations excavated, poured and left to cure to full strength, then levelled — a solid, permanent base for the build above it.

What you get
Level, load-bearing base
Ducting for power
Garden left tidy
05
3–5 weeks

Build

Frame, insulation, membrane, cladding, roof, glazing, first and second fix electrics, flooring and decoration — all by our own joiners and electricians.

What you get
Weekly progress photos
One point of contact
Agreed stage payments
06
Completion

Handover

We walk the room with you, hand over the paperwork and take the snags list seriously. Anything outstanding is closed within two weeks.

What you get
Part P electrical certificate
10-year structural guarantee
Care and warranty pack

What's included as standard

Priced into every room. Nothing here is an upgrade or a line added later.

Concrete pile foundations
Excavated, poured and levelled to full load-bearing strength.
Insulation to spec
Walls, floor and roof built to current building-regulation values.
Certified electrics
Consumer unit, sockets, lighting and a Part P certificate.
Glazing
Aluminium double-glazed sliders or bifolds, powder-coated.
Cladding
Composite cladding, finished on all elevations.
Flooring and decoration
Finished floor, plastered or panelled walls, painted.
Heating provision
Electric heating sized to the room and its glazing.
Guarantee
10-year structural cover and a written care pack.
What our customers say

Real reviews from finished projects

From the first survey to the final handover, LNC were straightforward and reliable — no subcontractors passing the buck. The room feels like it's always been part of the house.
Sarah H., Sowerby Bridge
We priced up three companies and LNC were the only ones who actually explained the planning rules before we committed to anything. Build was finished in five weeks, exactly as quoted.
Mark T., Halifax
The Domus has become my daughter's self-contained space — fully insulated, properly wired, no compromises. Worth every penny.
Priya K., Brighouse

Start with a survey

Free, no obligation, and you'll know your options within the week.